Main INDEX
Monthly INDEX
PREV
NEXT
User name Lindgren
Log entry time 07:13:19 on October 7,2002
Entry number 87551
keyword=shift summary
00:05 Am Continuing run 1191
00:06 End run 1191 1M events, Start run 1192
00:38 End Run 1192, 1M events, Start run 1193
01:11 End run 1193 1M events, start run 1194
01:15 Helium level in Q1 continues to vary between 35 and 60 over a 5 minute interval
01:45 End run 1194 1M events, start run 1195
01:50 Helium level varies between 60 and 70 over a 5 minute interval
01:58 TS1 crashed
02:00 Ended run 1195 337K events, start run 1196
02:35 Ended run 1196 1M events, start run 1197
03:08 Ended run 1197 1M events, start run 1198
03:40 Ended run 1198 1m events, start run 1199
04:12 Ended run 1199 1M events, start run 1200
04:30 MCC called to do a QE run. Will take 10 minutes, Ending run 1200.
04:35 MCC called to cancel their measurement. Start run 1201
05:08 Ended run 1201 1M events, start run 1202
05:42 Ended run 1202 1M events, start run 1203
05:54 Ended run 1203 332K events stopped run to warm up target
06:05 Both left and right Q1 crashed
JP Chen came in at 6:00 am to warm up the target.
Stopped beam at 6:00 am.
Took elastic data from midnight to 6:00 am. Q1 and Q2 and the right dipole crashed at 6:00 am. The dipole came back after resetting it.
We did not reset Q1 and Q2.