1600 | 1700 | 1800 | 1900 | 2000 | 2100 | 2200 | 2300 | Total Time | |
---|---|---|---|---|---|---|---|---|---|
Acceptable Beam in Use | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Beam Available but Not in Use | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Beam Not Available or Unacceptable | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Accelerator Con- figuration Chage | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 8 |
Experiment Ready | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Planned Config- uration Change | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 8 |
Unplanned Experiment Down | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Hall not ready reasons |
Comments: Waiting for the accelerator to finish the pass change. Reset left arm dipole after a quench. Had to reboot magnet IOC. Bob came in to reset the DAQ. Opened JTV to ready cryotarget for beam. Olivier found that the Wien angle wasn't changed during the energy change, so he called and informed the MCC that we need the max possible polarization, so the Wien angle has to be changed.
Data Entry by: K. McCormick