• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name adaq

    Log entry time 16:01:14 on October 13, 2002

    Entry number 88110

    keyword=Beam Time Accounting
    Hall A

    10/13/2002 0800-1600
    Experiment #: e00007
    Shift Leader: Z.-E. Meziani
    Shift Workers: R. Holt, K. Wang

    08000900100011001200130014001500Total Time
    Acceptable Beam
    in Use
    55 60 58 58 58 56 58 38 7.35
    Beam Available
    but Not in Use
    0.0 0.0 0.0 0.0 0.0 0.0 0.0 20 0.333333333333333
    Beam Not Available
    or Unacceptable
    5 0.0 2 2 2 4 2 2 0.316666666666667
    Accelerator Con-
    figuration Chage
    0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0
    Experiment
    Ready
    60 60 60 60 60 60 60 40 7.66666666666667
    Planned Config-
    uration Change
    0.0 0.0 0.0 0.0 0.0 0.0 0.0 20 0.333333333333333
    Unplanned
    Experiment Down
    0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00
    Hall not
    ready reasons

    Comments: Smooth running. Beam current slowly dropping.

    Data Entry by: Z.-E. Meziani