0800 | 0900 | 1000 | 1100 | 1200 | 1300 | 1400 | 1500 | Total Time | |
---|---|---|---|---|---|---|---|---|---|
Acceptable Beam in Use | 55 | 60 | 58 | 58 | 58 | 56 | 58 | 38 | 7.35 |
Beam Available but Not in Use | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 20 | 0.333333333333333 |
Beam Not Available or Unacceptable | 5 | 0.0 | 2 | 2 | 2 | 4 | 2 | 2 | 0.316666666666667 |
Accelerator Con- figuration Chage | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0 |
Experiment Ready | 60 | 60 | 60 | 60 | 60 | 60 | 60 | 40 | 7.66666666666667 |
Planned Config- uration Change | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 20 | 0.333333333333333 |
Unplanned Experiment Down | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0 |
Hall not ready reasons |
Comments: Smooth running. Beam current slowly dropping.
Data Entry by: Z.-E. Meziani