    User name vasulk

    Log entry time 00:02:06 on October15,2002

    Entry number 88194

    keyword=Swing Shift Summay

    16:00 Begin shift with beam off due to laser change

    15 cm dummy target P left: 2.4280 20.873 Degrees

    16:45 MCC called, and they will try to deliver 40 uA of beam

    17:24 Stop run 1471 for Moller measurement
    17:40 Moved target to Empty position
    19:20 Moller measurement complete. Setup for data taking in progress
    19:32 MCC ready to deliver beam. Move target to 15 cm dummy.
    Results from Moller measurement: Beam polarization = 75.8%
    22:30 Change Left-arm angle and momentum
    22:42 Left-arm changed to 29.131 degrees and P0 = 2.246 GeV/c
    23:15 Move target 15 cm LD2 + rad.

    Run Summary

    Run:
    1470 (15 cm dummy) Need to change prescale factors
    1471 (15 cm dummy) Events: 274k
    1472 (15 cm dummy) Events: 572k
    1473 (15 cm dummy) Events: 554k
    1474 (15 cm dummy) Events: 408k

    P left: 2.2460 29.131 Degrees
    1475 (15 cm dummy) Events: 801k
    1476 (15 cm LD2 + rad) Events: 1M
    1477 (15 cm LD2 + rad) Left over for Owl Shift