Began shift with 30uA on the 15cm Dummy Cell (1.4x1.4 raster).
08:22 Left Spectrometer to 39.754deg (2.011GeV)
09:00 MCC Removes beam for machine developement time.
09:38 Ed Folts calls and says he's setting the momentum of both arms to zero. A test of the magnets of Hall C are going to trip them anyway.
11:05 Ed Folts calls and gives the OK to return the spectrometers to their momentum settings.
11:57 Left arm cycled and momenta reset
12:57 MD over. Beam returns. 30uA.