1600 | 1700 | 1800 | 1900 | 2000 | 2100 | 2200 | 2300 | Total Time | |
---|---|---|---|---|---|---|---|---|---|
Acceptable Beam in Use | 0.0 | 0.0 | 0.0 | 30 | 22 | 47 | 33 | 0 | 2.2 |
Beam Available but Not in Use | 0 | 0 | 0 | 0 | 38 | 13 | 27 | 60 | 2.3 |
Beam Not Available or Unacceptable | 60 | 60 | 60 | 30 | 0 | 0 | 0 | 0 | 3.5 |
Accelerator Con- figuration Chage | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Experiment Ready | 60 | 60 | 60 | 60 | 22 | 47 | 33 | 0 | 5.7 |
Planned Config- uration Change | 0 | 0 | 0 | 0 | 38 | 13 | 27 | 60 | 2.3 |
Unplanned Experiment Down | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Hall not ready reasons |
Comments: Software problems (3.16 GeV/c sofware limit in the left arm)
Data Entry by: Eric Voutier