New crew on shift: Martin Epstein, Paul Ulmer, Eric Voutier
***************
17:05 Call MCC to have an update: the BCM team change some device bu they
dont know if this will solve the problem; they will send shortly the beam into
the hall to check the BCM.
17:20 MCC want to send low CW current in the line for checks; move to optics
target for safety... 5mn later they call back for correction, they want to send the
highest possible current (100 uA)
18:25 Move to empty target since MCC wants to go to the highest possible
current.
18:50 MCC ready to send 20uA CW; moving to 15cm LH2 target.
19:30 Start taking data on Ela_H02
20:22 Start moving to Ela_H03
21:13 Start data taking on Ela_H03
23:00 While changing to the next kinematics, we experience problems with the
left arm control screen: the momentum dont want to change... we called Javier.
23:30 MCC calls the software on call to try to solve the problem... Javier and
the software on call finally solve the problem: the software momentum limit
was set to 3.16 GeV/c (right arm limit) which was forbidding us to go higher...
problem is solved and we go gradually back to production.
Run History
-------------
--# Ela_H02
Run # 2593 .......... Good Run / 15cm LH2
Run # 2594 .......... Good Run / 15cm LH2
--# Ela_H03
Run # 2595 .......... Good Run / 15cm LH2
Run # 2596 .......... Good Run / 15cm LH2
Run # 2597 .......... Good Run / Optics