• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name Saha

    Log entry time 16:01:36 on October21,2002

    Entry number 88654

    keyword=Shift Summary

    Shift Summary
    ______________

    0800: Continuing Boiling Studies on Carbon Target
    Run 2607 22.2 uA, 430k events
    Run 2608 39.1 uA, 390k events
    Run 2609 59.8 uA, 380k events
    Run 2610 80.5 uA, 480k events
    0925: Boiling studies on LH2 target
    Run 2612 109 uA, 190k events
    1000: MCC MD time, Beam on for beam development
    1045: Controlled Access. Mark Stevens, Bogdan, Eugene make access.
    Run 2613, 2614 DAQ test runs with cosmics.
    DAQ configuration changed to "coinc" (changed from "unbuf")
    1225: Beam permit.
    1355: Continuing boiling studies on LH2 target
    Run 2615 110 uA, 550k events
    Run 2616 99.4 uA, 475k events
    Run 2617 79.7 uA, 550k events
    Run 2618 60.9 uA, 400k events OK, then DT jumped to 40% cause unknown, repeat run.
    Run 2619 59.7 uA, 600k events
    Run 2620 40.0 uA, 370k events
    Run 2621 19.9 uA, 250k events. Beam position changed within the first 2k events and then corrected itself.
    1600: Run 2622 10.0 uA, continuing