    Log entry time 13:27:34 on October23,2002

    Entry number 88877

    keyword=MCC turns on energy lock and FFB

    At 1:13, MCC calls and says that they are going to try to turn on the locks and then the fast feedback. We continue the run (2705), which is at 900k events when MCC calls. 2705 ends and 2706 begins but FFB is still off. Few minutes later, MCC calls to say that energy lock and FFB are on. There were several trips while they were turning things on, but nothing especially bad. Beam is at +0.4mm in x (both BPMs), so we ask for beam to be centered.