    08:00 Run 2782 Acceptance studies - LH2 15 cm - sieve collimator left arm
    08:06 Run 2783 continuing some conditions
    Beam unstable
    09:11 Run 2783 end. MCC take beam to do some injector check
    09:56 Run 2784 Acceptance studies - LH2 15 cm - left arm collimator open
    10:20 Run 2785 hanged not started
    10:28 Run 2786 Acceptance studies - LH2 15 cm - colls. left 6 msr right open
    10:53 Run 2787 Acceptance studies - LH2 15 cm - both colls. 6 msr
    11:22 Move to LH2 4 cm target - Machine problem with gun
    12:01 Run 2788 Acceptance studies - LH2 4 cm - both colls. 6 msr
    problems with machine - stopped run
    12:39 Run 2789 as the previous
    13:07 Run 2790 Acceptance studies - LH2 4 cm - colls. left 6 msr right open
    again problems with machine, they have to look at the injector - stop run
    13:22 Run 2791 as the previous (they will look at the injector in 10 minutes)
    13:31 Machine works with the injector
    15:47 Run 2792 Acceptance studies - LH2 4 cm - both colls. open
    end of run at 16:09
    Since the beginning of kinematics Q3D-f00 (run 2772) there is a bad indication
    for the flower mark in the left arm and in the vernier value.