User name W. Boeglin
Log entry time 00:05:33 on November 3,2002
Entry number 89473
keyword=Shift Summary
16:35 MCC crew chief called: Box Powersupply seem operational. Start checking the orbits and plans to put tuned beam into the hall by 17:00.
17:30 99 uA for a frew seconds, then ANOTHER magnet problem
19:25 Beam starts to return
19:29 start run 2920
Run # Start End # of Events Run Type
2920 19:29 20:15 730K Production (no endrun -> ROC2 problem)
2921 20:20 21:20 820K Production, accelerator problem(IOC crash)
22:15 Beam is back
2922 22:15 23:19 730K "Production" run, unstable beam
23:00 very unstable beam (many trips) RF problems
23:40 Software problems in accelerator