    User name W. Boeglin

    Log entry time 00:05:33 on November 3,2002

    Entry number 89473

    keyword=Shift Summary

    16:35 MCC crew chief called: Box Powersupply seem operational. Start checking the orbits and plans to put tuned beam into the hall by 17:00.
    17:30 99 uA for a frew seconds, then ANOTHER magnet problem
    19:25 Beam starts to return
    19:29 start run 2920


    Run # Start End # of Events Run Type
    2920 19:29 20:15 730K Production (no endrun -> ROC2 problem)
    2921 20:20 21:20 820K Production, accelerator problem(IOC crash)

    22:15 Beam is back

    2922 22:15 23:19 730K "Production" run, unstable beam
    23:00 very unstable beam (many trips) RF problems
    23:40 Software problems in accelerator