Hall A Experiment #: e00007
11/8/2002 0800-1600
Shift Leader: W. Boeglin
Shift Workers: K. McCormick, D. Hayes
0800 | 0900 | 1000 | 1100 | 1200 | 1300 | 1400 | 1500 | Total Time | |
---|---|---|---|---|---|---|---|---|---|
Acceptable Beam in Use | 0.650277777778 | 0.396944444444 | 0.0666666666667 | 0.0 | 0.05 | 0.794166666667 | 0.0747222222222 | 0.0 | 2.03 |
Beam Available but Not in Use | 0.0272222222222 | 0.0 | 0.0 | 0.0 | 0.0333333333333 | 0.0 | 0.0608333333333 | 0.0 | 0.12 |
Beam Not Available or Unacceptable | 0.322222222222 | 0.6 | 0.936666666667 | 1.0 | 0.916666666667 | 0.193611111111 | 0.863888888889 | 1.0 | 5.83 |
Accelerator Con- figuration Chage | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.00 |
Experiment Ready | 1.0 | 1.0 | 1.0 | 1.0 | 1.0 | 1.0 | 1.0 | 1.0 | 8.00 |
Planned Config- uration Change | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.00 |
Unplanned Experiment Down | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.00 |
Hall not ready reasons |
Comments: Beam not available due to too much beam loss in machine. Machine optimization still going on.
Data Entry by: W. Boeglin