User name W. Boeglin
Log entry time 16:08:59 on November 8,2002
Entry number 89860
keyword=Shift Summary
Continue taking data for Q3D_i40
Run Start End Type
3077 8:35 Production, 1M (many trips, every 4min)
3078 8:36 9:15 177K, no beam for 1/2 hour
3079 9:17 9:36 195K
3080 9:45 no beam for the last 10 min.
3081 12:54 14:07 1M Production
8:50 MCC called, vacuum convectron problem in arc1, no time estimate so far
9:15 " problem seems to be fixed -> expect beam back
9:35 Cavity problems -> no beam, no time estimate yet
9:45 beam seems to come back, is very unstable
10:05 MCC announced beam interruptions to work on increasing the beam current for Hall C as agreed upon in this mornings meeting. This is expected to take a maximum of 1 hour.
11:10 talked to PD about getteing the beam back. I agreed to wait until noon so that they can optimize the orbits for Hall C
12:15 MCC announced that they will start to return beam
12:50 beam starts to return (and trips immediately)
12:54 usable beam back
14:10 beam turned off for re-tuning due to too much loss in the machine.
15:35 MCC called and announced that they need at least another 1/2 hour.
16:00 we are still waiting for beam