17:22 MCC called: They will send tune beam in the Hall.
17:23 MCC called: They will send CW beam in the Hall.
17:24 MCC called: They will send 100 uA beam in the Hall.
17:26: Start ramping current to 100 uA
Start run 3083. Check beam spot size: ok
17:46 Beam is down (cavity trip). MCC predicts 10 min of time down. Stop run 3083
17:54 MCC called: They will send tune beam in the Hall.
17:57 MCC called: They will send CW beam in the Hall.
18:04 MCC called: They still have some problems with trips.
18:15: Tune beam
18:25: MCC called saying they will deliver 100 uA beam.
18:30 Beam is back. Start run 3084
18:32 Beam down Start stop run 3084 is junk.
18:43 Beam back. Start run 3085.
19:39 Stop run 3085, start run 3086
20:32 Stop run 3086, start run 3087
since ~21:00 the beam is pretty instable and goes up and down. MCC said that the problem comes from the Hall C beam.
21:20: Beam is down.
21:38. Beam still down -> stop run 3087
We will wait for a stable beam before to start a new run.
21:49: MCC called and said that the will deliver only 50 uA of beam while they are trying to fix the instability problem.
22:26: Beam seems stable now: Start run 3088
22:50: Stop run 3088: The DAQ may have some problem (error message reporting that the trigger supervisor and roc did not reported since a few min).
22:50, start run 3089
23:50. Stop run 3089. Start run 3090