Log entry time 00:03:00 on November13,2002
Entry number 90000
keyword=Shift Summary
16:15 MCC called to let us know that they have a problem with the power supply of a dipole of in the Hall A arc. We were not getting any beam anyway.
18:57. The magnet is back. MCC is sending pulse beam now for tuning.
19:01 MCC starts ramping the beam to I=100 uA.
After a few beam trips, the beam has been pretty stable at 100 uA.
21:40 left lecroy HV went off -> stop run 3126
21:43 HV back. Start run 3127