    User name Suleiman

    Log entry time 10:03:41 on November16,2002

    Entry number 90184

    keyword=New Lumi on the Pivot

    "Lumi 1" was installed on the target pivot. The PMT is shielded with
    one lead brick. It is in ADC2_2 (Third Channel)

    <\PRE>

    15 cm LD2, 100 uA, Fan 60 Hz, Raster 2.8x2.8
    Pivot
    Run # Start Stop OS Gain HV1 HV2 HV3
    2168 08:48 08:49 3 HG 0 0 0
    2169 08:52 08:54 3 HG -950 -950 -500
    2170 08:55 08:58 3 HG -950 -950 -500
    2171 08:59 09:00 3 HG -900 -900 -800
    2172 09:01 09:03 3 HG -800 -800 -900
    2173 09:05 09:06 13 HG -800 -800 -900
    2174 09:07 09:16 13 HG -900 -900 -1000
    ------
    Pivot (ppm)
    Run # Ib Start Stop OS Gain HV1 HV2 HV3 A1 A2 A3
    2175 100 09:17 09:26 13 HG -950 -950 -1050 6200 6200 7300
    2176 100 09:31 10:02 3 LG -950 -950 -1050 6000 6100 7200
    (Hall C Current went from 10 uA to 0 and back to 10 uA in the middle of the run)


    Figure of beam current is attached.









    FIGURE 1