Log entry time 07:52:46 on November18,2002
Entry number 90235
keyword=Owl Shift Summary
shortly after 0.00 5uA beam arrived, did Harp measurement
MCC called, they want to take beam away for 20 min, to work
on the frequent beam trips
shortly after 1.00 am 5uA beam
1) chamber test, chamber positioned next to big bite
1:20 we asked for controlled access to move chamber to second position
2:40 we are done, MCC has problems with Moeller Target
3:20 Moeller Target has still problems, we asked for controlled access
to move wire chamber to most interesting position behind BigBite,
since we are already behind schedule
around 5:00 MCC finally fixed Moeller problem (after consulting with Eugene
and entering the Hall they found a loose wire on an end switch)
5:10 MCC called: vacuum faults in A line, several valves closed
Target vacuum didnt show anything suspicious in that time (6*10**-6 Torr)
8:00 wire chamber tests ended, Mike Seely takes over for target work