    User name jpchen

    Log entry time 16:06:36 on January 6,2003

    Entry number 90596

    keyword=day shift summary

    1/6/03 day shift summary.
    Shift workers: L. Zhu, K. Wijesooriya, J. P. Chen

    Shift started with tuning beam 8:00 to 8:35.
    Then went into controlled access at about 9:30.
    9:30-11:30 controlled access, Bob Michael worked on left arm DAQ problem;
    Ed Folts checked the left Q1 problem;
    Patricia and J. P. reset the laser power and re-distributed the power to even out
    the circuit break load. Also Patricia took out one D2 filter and got the longitudinal
    EPR working.
    11:30 asked for beam and waiting for beam.
    (Note 10-12 was supposed for beam study).
    Hall is in power permit since ACC is working on some problems at the injector.
    1:30 pm went into the hall to reset Q1. And back to power permit.
    2:20 pm back to beam permit after moved target to BeO position.
    3:30-4:00 pm beam tuning, pulsed then 5 uA CW.
    4:00 pm MCC wants to have 30 uA to investigate 2-spot problem. We are going to move to EMPTY.