16:00 Work continues on the beam
16:30 Access to the Hall by Arne to work on OTR while work continues in Injector
17:15 Target Temperature Tests Underway
18:00 OTR work finished, Vince is finishing Target Temperature Study
18:50 15uA Beam to Hall A
19:00 OTR Check-Out / Looks Good
19:05 MCC Now Working On Centering The Beam On Beam Position
21:45 Found the beam offsets are off. We need to get the new survey number!
23:00 Final Beam Settings without Raster Setup.
The spot with Raster is not pretty, the rastered beam is focused
in y, so we would have to drive the raster in an eliptical shape in order
to make a circle on the BeO target.
23:01 An access into the Hall to fix the Hall A DAQ. (Bob Michaels)
23:55 The ARM has found the radiation levels in the Hall to be high and
has called in RadCon.