Log entry time 16:02:32 on January 7,2003
Entry number 90774
keyword=Day Shift Summary
0800: IA scan in progress.
0820: Optics Run #2 (with Sieve Slit) : 20139 Left Arm, 1139 Right Arm
~830: Optics Run #2 continued: 20140 Left Arm, 1140 Right Arm
0843: Optics setting #2 done, changing p0 from 1.042 -> 0.965
0910: magnets okay
0935: beam back
*** Optics setting #3 ***
0937: 20141 Left Arm, 1141 Right Arm 30% dead, need to set PS's to 2
0939: 20142 Left Arm, 1142 PS's to 2, but beam taken away to spend 10
minutes on Hall B beam tuning
0952: beam back, Left Arm 20143, Right Arm 1143
1014: Left Arm 20144, Right Arm 1144
1025: Left Arm 20145, Right Arm 1145
10:40: Optics setting #3 done, go to ARC energy measurement
Wait for MCC, wait, wait...
~11:40: AS in test determines that there appears to be broken wire in scanner.
The ARC ep measurement is scrapped. Going to target polarization measurement.
12:40 target polarization measurements done, go to temperature tests
14:00 temperature tests done, Bob Michaels now in Hall on controlled
access working on DAQ.
14:45 finish DAQ access, at the end of it we also go into the Hall and reset
the two tripped Q1s, before the control access checklist
15:00 MCC sending tuning beam into Hall,
15:15 Eugene came to do Moller measurement.