• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name Saha

    Log entry time 16:01:51 on January 9,2003

    Entry number 91220

    keyword=Run Summary

    Run Summary
    ___________

    0800: Waiting for beam
    Changing to Setting 12, 3He Delta asymmetry, Pol 3He Target
    Spectrometer momentum changed to 0.675 GeV
    0900: Run 20237/1237, Right arm momentum still changing.
    0912: Stopped runs 20237/1237
    Waiting for the target and momentum is stable.
    Reduced beam current to 2 uA, prescale changed to 1 on both arms
    0920: Runs 20238/1238 started
    0940: Runs 20238/1238 stopped, 2.5 M events
    Both target and beam dropped by 2 mm.
    0950: Runs 20239/1239 started
    0952: Stop runs. Drop beam and target by 1mm more (total 3 mm)
    0956: Runs 20240/1240 started
    1000: Runs stopped.
    Getting ready for pass change
    Hall being used by MCC for Beam Studies for the next ~20 mins.
    Hall Going to Controlled Access after that to work on Target Alignment
    Change Spectrometer : Momentum = 2.9 GeV, Angle = 25 degreees
    Target in Empty position
    1600: Still waiting for beam