Main INDEX
Monthly INDEX
PREV
NEXT
User name Higinbotham
Log entry time 00:02:22 on January10,2003
Entry number 91243
keyword=Shift Summary
4:00 Started Shift in controlled access while MCC prepares the change from
first to fourth pass.
5:00 MCC ready, but we need to finish access. Checking the Moller and
checking the transverse lasers.
6:00-800 Start tuning up beam to the Hall.
While checking the beam. Halls A and C take beam charge asym. data.
After Hall C has set their asym. to zero we find a 200 ppm asym. We
will now use the IA system at the injector to make this asym. even
smaller.
8:30 Beam ready for physics. The beam spot is 110 by 130 um (run#86).
The raster is set for 2mm radius. (ask MCC also for 2mm)
8:40 Target Polarization Measurements
9:40 Start Moller Measurements continued until midnight.