Main INDEX
Monthly INDEX
PREV
NEXT
User name solvignon
Log entry time 07:20:16 on January19,2003
Entry number 92513
keyword=PID detector calibration: right arm
I copied the new database updated with the calibration of the right arm and left arm cerenkov. The name is db_e01012_cercalib.
I also transfered the shower_calib.dat which was edited after the preshower/shower calibration. The old one is named now shower_calib_011903.dat.
The plots below are from run#1418.
The first plot is after cut on target and on cerenkov detector.
The second picture has no cut.
FIGURE 1
FIGURE 2