Main INDEX
Monthly INDEX
PREV
NEXT
User name vasulk
Log entry time 13:33:29 on January19,2003
Entry number 92535
This entry is a followup to: 92488
keyword=Masing procedure
As mentioned in Halog entry # 92488, when EPR was performed at 1:00 am this morning, the polarization dropped about 2%. If masing is seen, then the correction (gradient) coils should be put on. Both coils should be set to 5 amps.
Halog entry # 91326 provides information on how to turn the gradient coils on. The procedure to turn the coils on is to adjust both current readings until 5 amps is reached on both sets of coils. Ideally you want to turn the coils on slowly about 0.5 to 1 amp/minute. Both coils can be turned on at the same time.
On adaqlr3, I have made a work station that is labled grad. coils. Here you will find the controls mentioned in entry # 91326.