Main INDEX
Monthly INDEX
PREV
NEXT
User name A. Deur
Log entry time 16:18:01 on January23,2003
Entry number 93105
keyword=Shift summary
8:18We are done with kinematics 5.2.3 (last runs:20/1505)
Asked for beam to be removed. We are moving to kinematics 5.2.7 (beam 1/2 wave plate in, target spin 180 degree)
8:37 Done with target field rotation change. Waitinf for the beam. MCC is tuning it.
8:42 Beam is back
9:25 Beam down in Hall A due to beam study. It was suposed to be 10:00 but MCC took away the beam earlier due to "issues with accelerator that need to be studied in order to deliver us good beam".
We went back to 0 degree and moved the target to BeO position
11:32 move the 3He target in pick up coil for polarimetry