• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name averett

    Log entry time 00:09:09 on January24,2003

    Entry number 93153

    keyword=Swing Shift Summary


    16:00 Perform NMR measurement, 42.6%, Put target in 180 degree configuration, prepare to continue kinematic setting 5.2.7

    16:40 Move to empty reference cell to check beam quality after MCC worked on halo problem today. DAQ troubles on left arm. MCC can't get beam position lock to work. Move back to BeO while they work on it.

    17:25 Beam back, DAQ back. Start empty reference cell run.
    18:00 Halo looks OK. Begin production running.
    18:50 Beam off for RF work.
    19:50 Beam back, resume running
    20:10 Beam off again for RF problems, calling expert.
    23:15 Beam back, check on BeO first, looks good
    23:20 NMR measurement. 42.6%
    23:40 Resume production running.