User name G.M. Urciuoli
Log entry time 07:59:25 on January28,2003
Entry number 93632
keyword=1/28/2003 owl shift report
00:00 Empty target; holding field at 0 deg; HWP out.
00:10 Beam off and FSD masked
00:10 Moving the target from "empty target " to "BeO".
00:15 The target is now BeO.
00:19 FSD unmasked and beam on.
00:42 Beam off and FSD masked
00:46 Moving the target to "Pick-up coils" position.
00:49 The target is now at "Pick-up coils" position.
00:53 NMR measurement performed. Polarization is 41.56 %
1:02 Moving the target to "Pol. 3HE Cell".
1:04 The target is now "Pol. 3He cell". FSD unmasked and beam on again.
5:16 Beam off and FSD masked.
5:18 Moving the target to "Pick-up coils".
5:20 The target is now at "Pick-up coils" position.
5:30 NMR measurement perfomed. Polarization is 40%; moving the target to
"Pol. 3He cell".
5:32 The target is now "Pol. 3He cell".
5:35 Lasers 5, 6 and 7 stopped.
5:37 HWP moving in.
5:38 HWP in.
5:41 Moving the field to 180 deg from 0 deg.
5:58 Apperently the "Holding Field Rotation" vi stopped (at about 5:50) before the
field was at 180 deg (the monitor shows 183). To be on the safe side, we move back the field at 0 deg.
6:08 Holding field at 0 deg: we move it back to 180 deg.
6:18 Holding field at 180 deg.
6.20 Laser 5 enabled and started.
6.21 Laser 6 enabled and started.
6:23 Laser 7 enabled and started.
6:30 FSD unmasked and beam on