Hall A Experiment #: E01-012
01/30/03 0800-1600
Shift Leader: R.A Lindgren
Shift Workers: Gordon Cates, Jae-Choon Yang
0800 | 0900 | 1000 | 1100 | 1200 | 1300 | 1400 | 1500 | Total Time | |
---|---|---|---|---|---|---|---|---|---|
Acceptable Beam in Use | 0.84 | 0.41 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.67 | 1.93 |
Beam Available but Not in Use | 0.11 | 0.21 | 0.00 | 0.68 | 0.70 | 0.89 | 0.83 | 0.26 | 3.69 |
Beam Not Available or Unacceptable | 0.05 | 0.38 | 1.00 | 0.32 | 0.30 | 0.11 | 0.17 | 0.07 | 2.40 |
Accelerator Con- figuration Change | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
Experiment Ready | 1.00 | 1.00 | 1.00 | 1.00 | 1.00 | 0.00 | 0.00 | 0.67 | 5.67 |
Planned Config- uration Change | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
Unplanned Experiment Down | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
Hall not ready reasons | |||||||||
Target | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
Data Acq | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
Other | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 1.00 | 1.00 | 0.33 | 2.33 |
HRSL | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
HRSR | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
HALL_OFF | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
Comments: We could not get the Compton polarimeter out of the beam line to make a beam energy measurement. The energy measurement requires putting the beam through without the chicane dipole magnet on. Decided not to make energy measurement and to continue taking data. This was the main reason why we were down 2 hrs and 20 minutes.
Data Entry by: R.A. Lindgren