Main INDEX
Monthly INDEX
PREV
NEXT
User name anonymous
Log entry time 17:41:03 on January30,2003
Entry number 93893
keyword=shift summary day, partial
14:20 The electron polarimeter detector is stuck in the beam line due to some hardware problem, which requires an access to repair. So in lieu of an access we and the run coordinator decided to forgo the energy measurement and continue to take data. MCC is tuning the beam through the chicane and Sirish is monitoring using the polarimeter. We expect to be back taking data shortly
15:00 Beam is tuned. Mask and raster beam. Stop the beam.
Put target in. Measure polarization 38.3 %
15:20 Start runs 20631/1631/1572
16:00 Shift change Continue the same run.