    User name anonymous

    Log entry time 17:41:03 on January30,2003

    Entry number 93893

    keyword=shift summary day, partial

    14:20 The electron polarimeter detector is stuck in the beam line due to some hardware problem, which requires an access to repair. So in lieu of an access we and the run coordinator decided to forgo the energy measurement and continue to take data. MCC is tuning the beam through the chicane and Sirish is monitoring using the polarimeter. We expect to be back taking data shortly

    15:00 Beam is tuned. Mask and raster beam. Stop the beam.
    Put target in. Measure polarization 38.3 %

    15:20 Start runs 20631/1631/1572
    16:00 Shift change Continue the same run.