• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name Solvignon

    Log entry time 01:10:44 on February 4,2003

    Entry number 94624

    keyword=Compton: beam not through the chicane

    MCC called to know if we wanted the beam going through the Compton chicane.

    The run coordinator wasn't aware of the situation so I paged Vince to know what was the status.

    Since the beam was asked to not go through the chicane earlier and that the electron detector was moved out, we decided to keep running this way.