Main INDEX
Monthly INDEX
PREV
NEXT
User name Solvignon
Log entry time 01:10:44 on February 4,2003
Entry number 94624
keyword=Compton: beam not through the chicane
MCC called to know if we wanted the beam going through the Compton chicane.
The run coordinator wasn't aware of the situation so I paged Vince to know what was the status.
Since the beam was asked to not go through the chicane earlier and that the electron detector was moved out, we decided to keep running this way.