Main INDEX
Monthly INDEX
PREV
NEXT
User name Solvignon
Log entry time 08:38:46 on February 4,2003
Entry number 94701
Followups:
keyword=Shift Summary
While fixing DAQ on Left arm, the magnets were recycled for Kinematics 6.4: E'=2.199GeV.
Moved the target field at 0deg to be ready for 6.4.4.
Moved the target in BeO position to check the spot.
- MCC is tuning.
- run# 20740/1740: spot++ looked good
Moved target to pol. 3He.
- run# 20741/1741: from 1:03am to 1:21am--> problem left DAQ
left arm has 100% deadtime: TS1 disconnected.
So killed coda and telnet TS1.
Restarted runcontrol and started new run:
- run# 20742/1742: from 1:27am to 1:52am
TS1 is alive but still 100% deadtime on left DAQ.
So paged Bodo Reitz.
Reboot all Left ROCs and start run
- run# 20743: from 1:56am to 2:24am
- run#1743: from 1:56am to 2:30am
- run# 20744: from 2:24am to 2:30am
Bodo checked the scalers and the trigger supervisor recorded no event.
So ask for an access to reconnect cable.
2:53am: NMR measurement P= 37.9%
Everything looks fine: ask for beam back.
- run 20247/1747: from 3:16am to 3:40am
TS1 crashed for 404seconds. So killed coda and reboot TS1.
- run 20248/1748: from 3:47am to 3:55am : MCC called: they need to tune the beam.
4:04am: Beam is back
- run 20749/1749: from 4:04am to 4:47am: MCC called, they have a problem with the BCM so they need to tune the beam.
Beam back
- run 20750/1750: from 5:01am to 6:04am
- run 20751/1751: from 6:05am to 6:12am: MCC called, the BCM tripp aggain so they need to tune the beam.
Beam back.
- run 20752/1752: from 6:16am to 7:17am
- run 20753/1753: from 7:18am to 8.19am