    User name jpchen

    Log entry time 19:53:35 on February 6,2003

    Entry number 95110

    keyword=Target cell will be replaced, pass change, GEn test next.

    At about 2:20 pm the target cell Duke ruptured.
    We are going to replace it with a new target cell Exodus.
    The plan now is to change beam pass from 5 to 3 and have
    Gen test done while the new target polarization will be pumped up.
    Hall is in controlled access. Radcon cleaned up the scattering chamber and
    the target area. Vince just finished a Q-curve measurement (to check
    the pick-up coil/NMR system is still fine).
    We will start replace the cell now. At the mean time, GEn people
    are working to get the Gen detector be moved to 25 degree for the test.