Main INDEX
Monthly INDEX
PREV
NEXT
User name vasulk
Log entry time 05:32:58 on February 7,2003
Entry number 95137
keyword=EPR/Spectrum analyzer
Once Exodus was installed and the laser alignment was finished, I checked the spectrum analyzer. Since the target cell ruptured, we were concerned that the fiber may have been damaged. However the fiber is fine, and the spectrum analyzer works fine in longitudinal.
I also aligned the fiber coupler for the Longitudinal EPR system. After leaving the hall, I asked for MCC to put Hall A to Beam Permit. Currently they are sending tune beam to the hall.