• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name vasulk

    Log entry time 05:32:58 on February 7,2003

    Entry number 95137

    keyword=EPR/Spectrum analyzer

    Once Exodus was installed and the laser alignment was finished, I checked the spectrum analyzer. Since the target cell ruptured, we were concerned that the fiber may have been damaged. However the fiber is fine, and the spectrum analyzer works fine in longitudinal.

    I also aligned the fiber coupler for the Longitudinal EPR system. After leaving the hall, I asked for MCC to put Hall A to Beam Permit. Currently they are sending tune beam to the hall.