User name jpchen
Log entry time 16:16:14 on February 7,2003
Entry number 95178
keyword=Day shift 2nd half summary
day shift summary (continues):
11:15- 13:15 Beam study and hall a controlled access.
controlled access ended at ~14:50. Bodo did the DAQ work needed for the GEn
study. Vince and JP replaced the target oven RTD and switched EPR fibers.
14:50 get back to beam permit and waiting for beam.
Once beam comes, Moller will be performed.
15:45 beam back, wrong wien angle (old 5 pass setting).
Asked for Wien angle change to be optimal.
At the end of the shift, Beam not back yet.