• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name slifer

    Log entry time 04:44:39 on February 8,2003

    Entry number 95275

    keyword=replay after downtime

    Run 20828/1828. Carbon/BeO target. first runs after downtime.

    Left arm deltaP with preshower cut looks bad.
    Everthing else looks fine including raw preshower adc's
    so we continue. Probably the cuts are not reasonable in the kumac.

    ADC 8 and 16 on the right arm preshower look like the high voltages
    are two high. We looked at the lecroy voltages and they are similar to
    their neighbors. If we get to smooth running later we should try lowering
    the voltages though.


    FIGURE 1

    FIGURE 2