Log entry time 04:44:39 on February 8,2003
Entry number 95275
keyword=replay after downtime
Run 20828/1828. Carbon/BeO target. first runs after downtime.
Left arm deltaP with preshower cut looks bad.
Everthing else looks fine including raw preshower adc's
so we continue. Probably the cuts are not reasonable in the kumac.
ADC 8 and 16 on the right arm preshower look like the high voltages
are two high. We looked at the lecroy voltages and they are similar to
their neighbors. If we get to smooth running later we should try lowering
the voltages though.