Main INDEX
Monthly INDEX
PREV
NEXT
User name P. Solvignon
Log entry time 00:02:24 on February13,2003
Entry number 96219
keyword=Shift summary
Start with kinematics 6.3.6: target at 270deg and BHWP out.
- run #20956/1956: from 15:52 to 16:53
- run #20957/1957: from 16:53 to 17:26
17:25 --> Beam down: RF problem
17:31 --> beam back
- run #20958/1958: from 17:31 to 18:08
Then Moller measurement.
20:11 --> Moller measurement ended
20:18 --> NMR measurement: P= 39.4%
20:19 --> MCC ready to send beam
20:20 --> target in BeO position to check spot position but no beam due to a RF problem.
20:55 --> beam is back but needed to adjust BPM position
- run #20959/1959: from 21:09 to 22:29 (BeO run)
21:01 --> moved target to pol. 3He position.
21:08 --> ready to take beam
- run #20960/1960: from 21:09 to 22:29
Kinematic 6.3.6 done.
22:29 --> change the configuration of the target for Kinematic 6.3.7: target at 180deg
and asked for BHWP in.
22:47 --> target ready for beam
- run #20961/1961: from 22:48 to 23:51
- run #20962/1962: from 23:52 to ???