    User name P. Solvignon

    Log entry time 00:02:24 on February13,2003

    Entry number 96219

    keyword=Shift summary

    Start with kinematics 6.3.6: target at 270deg and BHWP out.

    - run #20956/1956: from 15:52 to 16:53
    - run #20957/1957: from 16:53 to 17:26


    17:25 --> Beam down: RF problem
    17:31 --> beam back

    - run #20958/1958: from 17:31 to 18:08

    Then Moller measurement.

    20:11 --> Moller measurement ended

    20:18 --> NMR measurement: P= 39.4%

    20:19 --> MCC ready to send beam

    20:20 --> target in BeO position to check spot position but no beam due to a RF problem.

    20:55 --> beam is back but needed to adjust BPM position

    - run #20959/1959: from 21:09 to 22:29 (BeO run)

    21:01 --> moved target to pol. 3He position.

    21:08 --> ready to take beam

    - run #20960/1960: from 21:09 to 22:29

    Kinematic 6.3.6 done.

    22:29 --> change the configuration of the target for Kinematic 6.3.7: target at 180deg
    and asked for BHWP in.

    22:47 --> target ready for beam

    - run #20961/1961: from 22:48 to 23:51
    - run #20962/1962: from 23:52 to ???