Hall A Experiment #: E01-012
02/13/03 0800-1600
Shift Leader: J. P. Chen
Shift Workers: S. Choi, N. Liyanaga
0800 | 0900 | 1000 | 1100 | 1200 | 1300 | 1400 | 1500 | Total Time | |
---|---|---|---|---|---|---|---|---|---|
Acceptable Beam in Use | 0.81 | 0.00 | 0.00 | 0.00 | 0.00 | 0.25 | 0.74 | 0.83 | 2.63 |
Beam Available but Not in Use | 0.08 | 0.00 | 0.00 | 0.00 | 0.00 | 0.17 | 0.17 | 0.00 | 0.41 |
Beam Not Available or Unacceptable | 0.11 | 0.00 | 0.00 | 0.00 | 1.00 | 0.58 | 0.10 | 0.17 | 1.96 |
Accelerator Con- figuration Change | 0.00 | 1.00 | 1.00 | 1.00 | 0.00 | 0.00 | 0.00 | 0.00 | 3.00 |
Experiment Ready | 0.92 | 0.00 | 0.00 | 0.17 | 1.00 | 0.83 | 0.83 | 1.00 | 4.75 |
Planned Config- uration Change | 0.08 | 1.00 | 1.00 | 0.83 | 0.00 | 0.17 | 0.17 | 0.00 | 3.25 |
Unplanned Experiment Down | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
Hall not ready reasons | |||||||||
Target | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
Data Acq | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
Other | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
HRSL | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
HRSR | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
HALL_OFF | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
Comments: 8:00-9:00 smooth data taking kin 6.3.7 9:00-12:00 Scheduled Hall access for spec survey and beam study. 13:30 beam back. raster check and study. Then Smooth data taking for 6.3.7 and 6.3.3
Data Entry by: jpchen