Main INDEX
Monthly INDEX
PREV
NEXT
User name P. Solvignon
Log entry time 05:32:10 on February14,2003
Entry number 96469
keyword=target tests: summary
From 23:25 to 1:17 : temperature test.
Then looked at EPR: the fiber must have moved during the reference cell installation and now I get only 35mV in the photodiode and 5uA of D2 light.
It is a lot too low to be able to perform an EPR measurement so I will wait 7:00am in case we can do the test before the survey people come.
During the second control access from 4:25 to 5:00, I performed an AFP loss test: 9 NMR measurements 3 minutes apart.
For the pressure curve data:
- pol. 3He
- empty reference cell
- ref. cell with 66psig of 3He
- ref. cell with 146psig of 3He
were all done with beam current at 5.2-5.3uA and with a 15mins run.
- ref. cell with 26psig of 3He had is run shorten due to the fact that Neutron test needed to reduce the current. So the run just lasted 8 mins.
- ref. cell with 26psig of 3He: take a run with beam current at 0.38psig