    User name vasulk

    Log entry time 09:12:45 on April27,2003

    Entry number 98795

    keyword=Day Shift Summary Part1

    Start shift in Controlled Access to replace the steel exit beam pipe with the aluminum one.

    Left HRS P0 = 1.1255 GeV/c
    Right HRS P0 = 1.1473 GeV/c
    Septum current = 114.5 A

    9:00 Finish Controlled Access, ask for Beam Permit