• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name vasulk

    Log entry time 16:11:39 on April27,2003

    Entry number 98885

    keyword=Shift Summary Part 3

    While waiting for beam, set Septum current to 130 Amps (readback 146.2 Amps)

    11:36 MCC ready to send beam, ask for 1 microA, unrastered beam
    Right Q2 tripped off, reset and cycle. Coming back now
    11:50 Right Q2 back, but no beam due to instabilities
    12:30 MCC should be able to send beam in 5 minutes
    12:36 Beam back, 1 microA, unrastered, empty target
    Run # 1324/20324

    Set Septum to 140 Amps (readback 156.2 Amps) Run # 1325/20325
    12:50 Ask for Controlled Access to remove Sieve slit and BeO target
    While waiting for Access, continue taking data at current settings

    Run # 1326/20326

    13:30 Hall in Controlled Access
    13:40 Set Septum current to 98.6 Amps (readback 115 Amps)
    14:55 Controll Access over, back to power permit
    During controlled access, the sieve slit and BeO target were removed, plus two additional collimators were placed downstreams.

    15:19 Run # 1327/20327 Single Carbon foil in without BeO target, 1 microA unrastered, sieve slit removed

    15:29 Set Septum current to 88.6 Amps (readback 105.2 Amps)
    Run # 1328/20328 (single foil, no BeO)

    15:34 Set Septum current to 78.6 Amps (readback 95.0 Amps)
    Run # 1329/20329 (single foil, no BeO)

    15:38 Set Septum current to 108.6 Amps (readback 125.0 Amps)
    Run # 1330/20330 (single foil, no BeO)

    15:47 Set Septum current to 118.6 Amps (readback 135.2 Amps)
    Run # 1331/20331 (single foil, no BeO)

    15:56 Set Septum current to 128.6 Amps (readback 145.2 Amps)
    Run # 1332/20332 (single foil, no BeO)

    16:05 Set Septum current to 138.6 Amps (readback 154.8 Amps)
    Run # 1333/20333 (single foil, no BeO)