Main INDEX
Monthly INDEX
PREV
NEXT
User name J. Singh
Log entry time 08:26:45 on May12,2003
Entry number 101396
keyword=Owl "Shift" Summary pt. 2
still recovering. shift septum strip chart is fig 1.
halls B and C got beam back at 2am.
@ 0640 did polarimetry, see 101391
EPR = 45.7%
NMR = 43.9%
@ 0800 => Multi Foil Target is in. waiting for septum LHe level to get to 85%, currently @82%.
FIGURE 1