Main INDEX
Monthly INDEX
PREV
NEXT
User name jpchen
Log entry time 16:17:08 on May23,2003
Entry number 103356
keyword=Today's survey completed
Alignment group completed survey of the sieve slit box, the target collimators
and the target ladder at around 3:30 pm. I removed the target collimator frames,
kept them in RADCON yellow bags at the target pivot area.
We took some pictures of the target area and the sieve slit box. Then I took the
three 12C foils out (which were already halfway fallen), put in the RADCON cabinet.
The target chamber windows were all put back on. Ed will make a cover for the downstream side. Make sure this cover is on before turn on any lasers (they are locked away for now).