    User name jpchen

    Log entry time 16:17:08 on May23,2003

    Entry number 103356

    keyword=Today's survey completed

    Alignment group completed survey of the sieve slit box, the target collimators
    and the target ladder at around 3:30 pm. I removed the target collimator frames,
    kept them in RADCON yellow bags at the target pivot area.
    We took some pictures of the target area and the sieve slit box. Then I took the
    three 12C foils out (which were already halfway fallen), put in the RADCON cabinet.
    The target chamber windows were all put back on. Ed will make a cover for the downstream side. Make sure this cover is on before turn on any lasers (they are locked away for now).