Main INDEX
Monthly INDEX
PREV
NEXT
User name Adaq
Log entry time 11:07:28 on July15,2003
Entry number 103861
This entry is a followup to: 103856
keyword=Left S2 ADC/TDC configuration
A few more relevant notes about the new S2 in the Left HRS. I'm still working at fine-tuning the .kumacs to monitor S2's status.
ADC: The ADC signal is known to be much weaker than for the other scintillator detectors -- only 10% of the original signal strength (by design) is making it to the ADC. Therefore, we expect the ADC spectrum to peak at less that 1000 ADC channels.
TDC: The re-timing is being performed by the S1 Right PMTs, therefore the S2 TDC signals will have a significant width. In addition, each TDC channel for S2 corresponds to 50ps, as opposed to 100ps for S1 and the old S2.