    User name G.M. Urciuoli

    Log entry time 16:05:50 on July25,2003

    Entry number 106852

    keyword=7/25/03 day shift report

    Shift crew
    SL G.M. Urciuoli
    TO Z.-E. Meziani
    3rd Bin Ma

    8:00 shift starts


    Beam 2uA

    Time Run # Target raster ps1 ps2 N. of Events
    8:15 2791 single foil ON 3 3 2.2 M
    8:39 2792 single foil OFF 3 3 2.1 M
    8:58 2793 empty target OFF 1 1 1.5 M
    9:10 2794 empty target ON 1 1 1.6 M

    Beam 1 uA

    9:27 2795 empty ref.cell ON 1 1 2.1 M

    Beam 1.3 uA

    9:44 2796 N2 ref. cell ON 3 3 2.0 M
    (30 psig)

    9:55 2797 N2 ref. cell ON JUNK
    (90 psig)

    10: 2798 N2 ref. cell ON stopped because the beam went off

    IMPORTANT the septum current was wrongly set in all these runs for the previous
    shift crew. It was 289.26 A instead of 292.55. We caught the mistake as we were
    ready to move to a new momentum.

    10:30 - ??? Controlled access during beam studies and restoration. Among the tasks was investigation of problems with S2m. Cosmic runs 22800 through 22806 were specialized for these investigations and should be ignored.

    13:40 Cosmic run (run number 22807)