    User name jpchen

    Log entry time 16:05:12 on July28,2003

    Entry number 107697

    keyword=day shift summary

    Shift Summary:
    Shift workers: R. Roche, R. Subedi, J. P. Chen

    8:00 continue kine 6.23 longituninal
    run 2943, 8:06-8:27, 3.2 M
    run 2944, 8:30-8:40, 1.3 M

    8:40 changed to kin 6.23 transverse
    (longitunidal lasers mistakenly on from 8:45-9:20).
    run 2945, 8:45-9:00, ~ 3M.
    Right arm coda crashed at the end of run. No endrun for run2945
    9:00 Beam off for QE measurement
    9:15 Beam back, MCC starting energy measurement for Hall C,
    while we continue data taking for 6.23 transverse.
    run 2946, 9:17-9:34, 3.2M
    9:35 Change back to kin 6.23 longitudinal
    run 2947 9:40-9:59, 3.1 M
    9:55-10:01 Beam off
    run 2948 10:01-10:07, 1M
    10:07 Beam Study (half an hour) and pass change (from 4 pass to 2 pass, 2 hours scheduled) starts.
    14:40 cw beam back to the hall, tuning continue.

    15:32 harp scan #2265 - coda #2949
    coda #2950 - junk
    MCC adjusting horizontal harp (was 73 um)
    15:59 harp scan #2266 : scanner 6 horiz=80 um, vert=130 um