Day shift summary for 31 July 2003
owl shift had just started kin 7.02 elastic scattering:
2.84 GeV, BHWP out, THWP out, 0 degrees
~9:10 Kent does pita measurement so we can get beam
charge asymmetry down to about 0.
~09:20 David puts in Compton detector as background
conditions are now small; he miscommunicates with
MCC and asks for beam off, but does not ask to mask
detector motion. Trip.
~9:30 right arm ts0 problem. reset within coda appears to work.
10:00 speak with Hall B about our BHWP plans
10:15 start configuration change to ref cell, also put BHWP in
so Kent can do charge asym fixes
11:10 Kent has finished!
11:22 going back to elastic scattering:
New setpoints for charge asymmetry input from Kent's analysis.
Target changed with target half wave plate in, rotate the holding field
from 0 to 180. Beam half wave plate still in.
11:51 target stable, ask for beam
12:30 JP calls to ask about target configuration and whether
it is depolarizing. Vince and Jaideep find a ``nonproblem'' (EPICS
variables not updating) and a real problem, holding field got stuck
at 90 degrees, did not go to 180 degrees.
13:10 target pol 37 %, ask for beam back
14:05 Seonho asks us to take data at 5 k to speed things up, we adjust ps1.
14:41 ask mcc to take out bhwp
15:55 start setting up spectrometer for next kinemtics