    User name P. Solvignon

    Log entry time 00:03:27 on August 4,2003

    Entry number 108825

    keyword=Shift summary

    17:13 move to pick-up coil position.
    17:48 start temperature test
    20:17 end of temperature test.
    22:46 all cryo levels are back up. Left arm magnets are already set at the good momentum. Right arm magnet current
    23:06 MCC called: they have to make an access in the LINAC because of a vacuum problem.