Hall A Experiment #: E97-110
08/08/03 1600-2400
Shift Leader: J. P. Chen
Shift Workers: B. Craver, D. Margaziotis
1600 | 1700 | 1800 | 1900 | 2000 | 2100 | 2200 | 2300 | Total Time | |
---|---|---|---|---|---|---|---|---|---|
Acceptable Beam in Use | 0.00 | 0.17 | 0.83 | 0.50 | 0.09 | 0.58 | 0.44 | 0.43 | 3.05 |
Beam Available but Not in Use | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.33 | 0.50 | 0.40 | 1.23 |
Beam Not Available or Unacceptable | 1.00 | 0.58 | 0.17 | 0.17 | 0.40 | 0.08 | 0.06 | 0.17 | 2.63 |
Accelerator Con- figuration Change | 0.00 | 0.25 | 0.00 | 0.33 | 0.50 | 0.00 | 0.00 | 0.00 | 1.08 |
Experiment Ready | 1.00 | 1.00 | 1.00 | 1.00 | 1.00 | 0.67 | 0.50 | 0.60 | 6.77 |
Planned Config- uration Change | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.33 | 0.50 | 0.40 | 1.23 |
Unplanned Experiment Down | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
Hall not ready reasons | |||||||||
Target | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
Data Acq | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
Other | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
HRSL | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
HRSR | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
HALL_OFF | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
Comments: 16:00 MCC working on changing setting for separation. 17:00 beam back, tuning 17:30-19:45 Moller, pol=76.5%, C=50+-5% 20:00 Compton tuning 20:40 Adjusting beam size and optics tuning 22:24-23:50 Optics data taking 23:50 requested controlled access to take sieve slits, install target collimators.
Data Entry by: J. P. Chen