• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name K. McCormick

    Log entry time 13:10:47 on August15,2003

    Entry number 110971

    keyword=Delay in returning from beam studies

    There is a delay in recovering from beam studies because the South Linac was taken to Restricted Access during the studies and now some magnets have to be cycled. The reason is (from the ELOG):

    The SLinac and BSY were taken to Restricted Access so that a vacuum pump cart could be removed from the machine. This work coincided with the Injector beam studies. The tunnel was cleared and ready for sweeping at 11:00 AM.