    User name Holmstrom

    Log entry time 18:45:18 on August18,2003

    Entry number 111860

    keyword=Step #2 of the BCM Linerarity Precedure

    I went to MCC and watched them do steps #1 and #2 of the BCM Linearity Precedure.

    We took data at the following currents and attentuator settings:

    I Att
    95 550
    50 319
    20 210
    10 160
    5 130
    2 95
    1 75

    The FC#2 in magnet settings were:
    MBH0L02H -28.0
    MBH0L02V 5.40

    We stopped logging data at 18:30.

    Step #3 was not done since no beam could be delivered to the hall.