User name Holmstrom
Log entry time 18:45:18 on August18,2003
Entry number 111860
keyword=Step #2 of the BCM Linerarity Precedure
I went to MCC and watched them do steps #1 and #2 of the BCM Linearity Precedure.
We took data at the following currents and attentuator settings:
I Att
95 550
50 319
20 210
10 160
5 130
2 95
1 75
The FC#2 in magnet settings were:
MBH0L02H -28.0
MBH0L02V 5.40
We stopped logging data at 18:30.
Step #3 was not done since no beam could be delivered to the hall.